Sub-contract Rates - Akerabi

Sub-Contract Rates List

PROJECT:- BUILDING CONSTRUCTION  
Labour offer is subject to negotiation/revision based on the volume of work and work environment(Working condition)
DescriptionUnitLabour Unit Rate
A. SUB - STRUCTURE.
1. EXCAVATION & EARTH WORK .
Clearing the site to remove top soil to an average depth of 200mm.m212
Bulk excavation in an ordinary soil to a depth not exceeding 1500 mm from reduced level.m3120
Ditto item No. 1.2. but not exceeding 3000 mm from reduced level.m3150
Bulk excavation in moderately weathered rock to a depth not exceeding 4000 mm from reduced level.m3240
Bulk excavation in hard rock to a depth not exceeding 6000 mm from reduced level.m3390
Pit excavation for isolated footing pads in ordinary soilm3150
Pit excavation for isolated footing pads in moderately weathered rock to a max depth of 5.60m from reduced levelm3175
Pit excavation for isolated footing pads in rocks to a max depth of 5.60m from reduced levelm3185
Trench excavation to a max depth of 2.00m from reduced levelm3150
Back fill under hard core/around foundation with selected material and well compacted in layers of not exceeding 250 mm thick untill compaction attaining 98% dry density. Compactor from contractorm3180
250mm thick basaltic or equivalent stone hard core .m265
Cart away surplus/unsuitable excavated material to a maximum distance from the site.m390
2. CONCRETE WORK
50mm thick lean concrete in class C-5 with minimum cement content of 150kg/m3 under:-m240
Reinforced concrete class in C-25 cast in to form works and vibrated around rod reinforcement bars (form work and reinforcement bars are measured separately) . Mixer and vibrator to be supplied by the contractor
a) Isolated footing pads/ Mat slabm3750
b) Foundation Column (up to ± 0.00).m3950
c) Retaining wall (up to±0.00).m3950
d) 10 cm thick Basement Floor Slab .m2110
e) 15 cm thick Ground Floor.m2150
f) Floor slab beams (up to ± 0.00).m3750
g) Stair case (up to ± 0.00).m3950
Provide ,cut and fix in position sawn Zigba wood formwork price includes placing in position, fixing and dismantling works. Formwork related materials to be spplied by the contractor.
a) Isolated footing padsm2240
b) Foundation Column (up to ± 0.00).m2240
c) Retaining wall (up to±0.00).m2240
d) 10 cm thick Basement Floor Slab .m2240
e) 15 cm thick Ground Floor.m2240
f) Floor slab beams (up to ± 0.00).m2240
g) Stair case (up to ± 0.00).m2240
Reinforcement steel bars according to structural drawing price includes cutting bending placing in position and tying wires
a) Ø 6mm plain bar.kg7
b) Ø 8-24mm deformed bar.kg6.5
3. MASONRY WORK.
50cm thick hard stone masonry wall bedded in cement mortar (1:3).Price shall include mortar bed.
a) below ground levelm3350
b) above ground levelm3350
250 mm thick brick /Double Layer/ wall bedded in cement mortar.m2280
125 mm thick brick/ Single Layer/ wall bedded in cement mortar.m2240
4. WATER PROOFING WORK
Membrane type water proof material or equivalent for external parts of building as per the manufacturers instruction.m2150
B. SUPERSTRUCTURE
1. CONCRETE WORK
Reinforced concrete class in C-25 cast in to form works and vibrated around rod reinforcement bars (form work and reinforcement bars are measured separately) . Mixer and vibrator to be supplied by the contractor
a) elevation columns.m3950
b) Floor beams including roof and water tanker slab beams.m3800
c) 15cm thick Floor Slabs including roof and water tanker slabs.m2180
d) Stair case.m3950
e) Concrete Parapet wallsm3950
f) Door & window lintelsm3950
Provide cut and fix in position sawn Zigba wood formwork price includes placing in position, fixing and dismantling.
a) elevation columns.m2250
b) Floor beams.m2250
c) Floor Slabsm2250
d) Stair case.m2250
e) Concrete Parapet wallsm2250
f) Door & window lintelsm2250
Reinforcement steel bars according to structural drawing. Price includes cutting bending placing in position and tying wires.
a) Ø 6mm plain bar.kg7
b) Ø 8-24mm deformed bar.kg6.75
2. BLOCK WORK
Construct 200mm thick HCB wall bedded in cement sand mortar (1:3) both sides left for plastering.m275
Construct 150mm thick HCB wall bedded in cement sand mortar (1:3) both sides left for plastering.m275
Construct 100mm thick HCB wall bedded in cement sand mortar (1:3) both sides left for plastering.m275
3. CARPENTRY & JOINERY
Wooden Doors and Windows fixingNo250
4 - ROOF WATER PROOFING WORKS
Apply light weight concrete with 50mm average thickness to concrete slab providing 2% slope towards down pipe.m260
30mm thick cement & sand mortar mix (1:3) screed on top of light weight concrete.m260
5. ALUMINUM WORK
Aluminum Doors and windowsNo250
6. FINISHING WORK
Apply two coats of plastering in cement mortar (1:3) price shall include pre cleaning & preparation of surface/Chieselling and edge works.
a) To internal HCB wall.m285
b) To external HCB wall.m290
c) To concrete structures, ceiling & soffit of stair case.m285
Gypsum plastering for internal wall and concrete surface, ceiling and stair case soffit.m225
Porocelein floor tiles bedded in cement mortar mix (1:3).m2110
PVC floor tiles fixed to floor bedded in proper admixture.m245
Ceramic floor tiles bedded in cement mortar mix (1:3).m295
Ceramic wall tiles bedded in cement mortar mix (1:3) .m295
100mm height porcelein tile skirting stuck to wall with cement mortar (1:3) mix.ml50
Supply and fix PVC skirting stuck to wallml25
Supply and fix 10cm high ceramic skirting stuck to wall.ml50
Provide and fix approved quality marble staircase tread and riser. Price includes cement mortar mix of 1:3 .
a) 3cm thick Thread.ml75
b) 2cm thick Riser.ml75
c) 3cm thick landingm2150
48mm thick cement sand screed ratio of (1:3) trowel finish to basement floor.m250
25cmx3cm marble door and window cill including cement mortar bed jointed in cement mortar mix(1:3).ml120
100*20mm marble tile skirting in cement sand mortar mix (1:3) backing.ml65
7. PAINTING WORK
Plastic emulsion paint to all internal plastered HCB wall.m225
Ditto as item 7.1 to concrete ceiling & soffit of stair case.m225
Quartz paint to all external wall surfacem250
Granite paint to all external wall surfacem2150
Shopping Cart
There are no products in the cart!
Continue Shopping
0